The following was posted by Sven Eriksson on Jerry Sjostrand's Express Help Page, http://www.sierratel.com/jerico/. Posted here by permission of Sven

1. Use 1" peel ply on top of all Q-cell fillets. It makes a very smooth
fillet without the need to sand it before applying fiberglass.

2. I found it very inconvenient to "glue" anchor nuts to the structure due
to the difficulty of keeping resin out of the threads. I found the solution in the liquid
masking rubber used when machine soldering PCB:s. It is used to mask holes on the
PCB which should be hand soldered after machine soldering of the other
components. This rubber compound is great to mask bolt hole in anchor nuts when
gluing and glassing. After fully cured you just take away the rubber plug and you will
have a perfect anchor nut for use.

3. I used a retarder for my resin called 2,4-pentadion. 0.1 % of this stuff
added to my normal resin will give you a working time of slightly more than an hour at
70 F and 2% MEKP. Although I use a vinylester system from Interplastic Corp. This
method should also be usable with Derakane resin as I suppose is used by US
builders. I think I have seen a site on internet called www.derakane.com that tells all
about Derakane resin.

4. I have also found that it is possible to store promoted resin for longer
periods of time by keeping it at a temperature lower than 30-35 F.
Unpromoted resin can be stored at least two years at this temp. Promoted resin at
least nine months. When you should use the resin you just raise the temperature back
to normal and it will be immediately ready for use. Reasons for me to store resin is
that small quantities are expensive (1000 grams will be $30) and the company selling
the stuff will not sell less than 5 gallons at a time.

Cheers

Sven

Sven Eriksson
EMAIL: se@ebox.tninet.se
Top of pagePrevious messageNext messageBottom of page Link to this message

Tom Hutchison
Posted on Tuesday, August 10, 1999 - 09:24 am:   

I worked out a method of Q-celling joints during the Builder Assist program that works well for me.

1. Use a 1 quart Ziploc freezer bag, folded into a triangle with two layers of masking tape along the sides. Cut off the resulting point for a 3/8" opening. Use this "cake decorating" bag for laying a small bead along the joint.

2. "Prime" the joint with a light application of resin using a brush before squeezing a bead of Q-cell along the joint.

3. Dip an index finger into acetone before making the radius along the joint with the Q-cell.

4. After the radius is formed, brush very lightly with a paint brush dipped into a minimal amount of acetone to smooth out the Q-cell, followed by running the index finger along the joint.

The result is a very smooth, nice looking Q-cell joint. And it is very fast.

Tom
Top of pagePrevious messageNext messageBottom of page Link to this message

CBROS
Posted on Saturday, August 21, 1999 - 06:44 pm:   

Tom:
Your information on the use of "Zip Lock" bags is good. It is indeed a very clean method of applying Q cell fillets.
At the same time, in my opinion, I would prefer Svend's use of peel ply as it does make it easy to make fillets on relatively straight runs, but has the added advantage of leaving a "layup ready" surface. Without using peel ply we have always sanded Q cell fillets to "break the glaze" before applying glass. The use of peel ply to finish fillets requiring milled fiber is especially helpful, and allows shaping using a tongue depressor, but I think you will find that the use of "Zip Lock" bags won't work for this application.
Top of pagePrevious messageNext messageBottom of page Link to this message

Tom Hutchison
Posted on Sunday, August 22, 1999 - 12:41 pm:   

I will certainly try the peel ply when I go back for my second factory session Sept. 13. Anything to improve the process.

We used the "Zip Lock" bag method for applying all the milled fiber to large structural joins and skin closings. I wonder if we mixed the mill fiber to a looser consistency.

Tom
Top of pagePrevious messageNext messageBottom of page Link to this message

Kevin Dennes
Posted on Wednesday, September 08, 1999 - 11:56 pm:   

Our "Mellinium" is about to leave the factory and to be sent here to us in Sydney, Australia.
I just want to say that the information that you are providing in this forum is wonderfully helpful. Please keep it going.
Top of pagePrevious messageNext messageBottom of page Link to this message

Gary Markwardt
Posted on Thursday, September 09, 1999 - 08:11 pm:   

I used a "2 to 1" millfiber mixture for all my closings (e.g., 200 grams of catalyzed cabacell & 100 grams milled fiber) and still used the zip lock bags with no problems. Not sure if you mentioned that the bag edges were all reinforced with a layer of masking tape before filling. A thick Q-cell mixture sometimes causes a bag "blowout" which can usually be folded into the center to finish up.
Top of pagePrevious messageNext messageBottom of page Link to this message

tomhuth
Posted on Monday, October 25, 1999 - 07:08 pm:   

At Sven Ericksson's urging I have put a link on the Express-Builder.com home page to his great article on making multiple fiberglass layups. The article resides on Jerry Sjostrand's Express Builders Help Page. I tried his method when I was doing a couple of large layups with great results.

Tom
Top of pagePrevious messageNext messageBottom of page Link to this message

tomhutch
Posted on Thursday, November 11, 1999 - 04:53 pm:   

The following was posted on the Lancair Mail List and reposted here with permission of the author

To get a nice even finish around inspection plates and access doors, here's my routine. First, make sure the door is final mounted, flush to the adjacent area and secure, no wiggle, the flanges behind the door are done and trimmed to final opening. Most flanges end up about 3/8"-1/2" wide under the door. Recheck that the door is in final shape, rounded corners and edges straightedge straight, etc. No filler goes on the door edge: won't hold. All the fill is TO the door edge, used as the fill tool guide.

Put one layer of duct tape under the edge of the door, no overlaps, say 1/2" wide, razor trim it to the edge. Close the door. Scuff and clean the area
between the door edge out to the finished skin, paint on a bit of epoxy,remove any excess. Put on some not too dry micro (with a bit of flox in it) all around the door, avoiding hinges and latches. Pat it down with your gloved finger. Take a tongue depressor, stir stick, split lengthwise to a
narrow 1/8" tool and run it in the groove to be created, keeping it pressed against the door itself. You will get a uniform groove all around the door if your micro is not too dry. Use the same tool to remove the excess off THE DOOR side only. Let it all cure.

The next day, pop the door open, remove the duct tape, remove any chunks on the flange, inside the groove, under the door, reclose the door and sand it all even, then finish the sharp edge of the groove itself lightly with fine sandpaper. You should have an even gap, the width of the stir stick, flush with the surface, as you sanded it so. Easily touched up if screwed up, enough room for paint buildup. Have fun...

Robert Forest
N295P
Top of pagePrevious messageNext messageBottom of page Link to this message

Darrell M Peterson
New member
Username: Darrell

Post Number: 14
Registered: 03-2006
Posted on Saturday, February 19, 2011 - 08:21 am:   

From the Express factory- There has been a lot of discussion about the elevator & rudder controls & weight, so we decided to take a look pertaining to the weight.
We removed the right elevator-weight was 17.5# then the left elevator ,this came in at 18.5 #I assume this was heavier because or the trim servo & hinge.The rudder came in at 34# our total weight was 70#, this was 11#lighter than Bruce Newlands?
We then decided to build them out of carbon fiber,the weights are as follows. Rudder 18.5#- right elevator 14#- left elevator 13.5#. The total weight nowis 46#,for a total savings of 24#, and by doing this helps our CG because on our 2000-RG,with the F-5W143wing wer carry 26 gallons of fuel behind the spar,but this is not a normal situation.
With our new rudder horn & cables ,I can fly this 2000-RGin slow flighe at 60KTS& wag the tail like a fish in water. It stalls at 50Ktslightly loaded & holding the stick back in my lap,I still have rudder control. The new F-5 wing is larger,a bit slower ,but much more docile.
On our planes, the rudder control is great,the poor control might be because of the push pull cables & the short rudder horn hinge ,that we do not recomend any more.
Top of pagePrevious messageNext messageBottom of page Link to this message

Jim Oyler
New member
Username: Midniteoyl

Post Number: 133
Registered: 07-2003
Posted on Saturday, February 19, 2011 - 12:37 pm:   

Is this something you will incorporate into the kits?
Top of pagePrevious messageNext messageBottom of page Link to this message

Ben Baltrusaitis
New member
Username: Freepistol

Post Number: 29
Registered: 09-2005
Posted on Saturday, February 19, 2011 - 02:11 pm:   

Will it be available for flying Expresses?
Top of pagePrevious messageNext messageBottom of page Link to this message

Chaz King
New member
Username: Chazking

Post Number: 28
Registered: 01-2005
Posted on Saturday, February 19, 2011 - 04:28 pm:   

Darrell,

Just what does that mean to us?

Nice you have the control surfaces lighter, but with the older wing, so what!

Are you planning to provide reasonably priced retrofit kits for those truly flying Expresses?

Are you just teasing us?

Do you have something serious in mind!?

Been hyped by Express to often!

Chäz
Top of pagePrevious messageNext messageBottom of page Link to this message

Darrell M Peterson
New member
Username: Darrell

Post Number: 15
Registered: 03-2006
Posted on Saturday, February 19, 2011 - 06:10 pm:   

From the Factory With reference to the new rudder horn and cables, we will have a completed drawing and will post it on our web site , for everyone to see & use. There will be a lot pictures showing every detail.
We should have the drawings ready by April 2nd.
Top of pagePrevious messageNext messageBottom of page Link to this message

Eric Holmberg
New member
Username: Erich

Post Number: 125
Registered: 05-2002
Posted on Sunday, February 20, 2011 - 09:10 am:   

Excellent, thanks Darrell!

-Eric
Top of pagePrevious messageNext messageBottom of page Link to this message

Darrell M Peterson
New member
Username: Darrell

Post Number: 16
Registered: 03-2006
Posted on Sunday, February 20, 2011 - 02:58 pm:   

Tail tips- There has been a lot of chatter about the heavy tail & the poor control. A lot of builders build differently,we ended up with 10# less than Mr Newlnds.We wanted ours lighter on the RG & it worked out wellfor us . We are not recomending to any one to go with a lighter tail unless there CG requires it.Before we made the change we had very good control with rudder & elevator,we went to carbon fiber because of the CG in the 2000-RG with the F-5 wing-
In our new Kits we will include the new rudder horn and cables & pullys the new drawings for this is going to be posted on our web site in April. Carbon fiber tailfeathers are not going to be part of our standard kit.
Top of pagePrevious messageNext messageBottom of page Link to this message

Jim Oyler
New member
Username: Midniteoyl

Post Number: 134
Registered: 07-2003
Posted on Sunday, February 20, 2011 - 04:46 pm:   

"There has been a lot of chatter about the heavy tail & the poor control."

Hmm... I thought the plane was nose heavy, not tail heavy? Or was that the Cruciform?
Top of pagePrevious messageNext messageBottom of page Link to this message

Bruce Newlan
New member
Username: Bnewlan

Post Number: 9
Registered: 09-2002
Posted on Sunday, February 20, 2011 - 09:44 pm:   

Darrell is correct regarding original weights in that my Series 90 weights were as follows: Rudder- 35#. Left elev.-24#, right elev. 22# for a total of 81# which is 11# heavier than Darrell's example. However, my Aluminum tail came in lower than Darrell's carbon fiber tail as foll: Rudder-17.1#, Left elev.-12.8# and right elev.-11.6# for a total saving of 39.5#. This was very significant for my airplane.
Top of pagePrevious messageNext messageBottom of page Link to this message

Shawn kelley
New member
Username: Skelley

Post Number: 34
Registered: 01-2004
Posted on Monday, February 21, 2011 - 06:03 pm:   

You know I have over 270hrs on my Series 90 tail and I have no trouble with the rudder or the elevators. I my say that they are alittle too lite. as for being tail heavy? No I have to fly with trim nose up. You have3 to look at what size engine you have If you have a 4 cylinder you are going to have a tail heavy plane but if you have a 6 cylinder you should be fine.
Top of pagePrevious messageNext messageBottom of page Link to this message

Jim Oyler
New member
Username: Midniteoyl

Post Number: 135
Registered: 07-2003
Posted on Monday, February 21, 2011 - 07:55 pm:   

Bruce:

I would be interested in seeing any drawings and/or pics of your aluminum tail feathers..Did you have any trouble balancing them? What about flutter margin?
Top of pagePrevious messageNext messageBottom of page Link to this message

Gay Hamilton
New member
Username: Ghamilt

Post Number: 1
Registered: 09-2008
Posted on Wednesday, February 23, 2011 - 10:32 am:   

I had a major problem with my rudder control on N188DS. The problem was lack of control pressure from the cables and the rudder. The mod we did was to increase the rudder hinge and reroute the cables thru the fuselage as Darrell is now doing. Thank God we have a factory to assist us in improving or aircraft and this web site in getting the information out to everyone.

Add Your Message Here
Post:
Bold text Italics Underline Create a hyperlink Insert a clipart image

Username: Posting Information:
This is a private posting area. Only registered users and moderators may post messages here.
Password:
Options: Enable HTML code in message
Automatically activate URLs in message
Action: